Going to keep this short and sweet -
Contract signed September 25th
Dig started November 3rd
Preliminary work was removing the sprinkler system in the back. Fencing to keep the dogs out of the build area.
Relocating some plants. All this was done by us -- Our landscaping contact ghosted after they installed a side gate.
Note on the design -- The first step is out of the water. It's completely covered with an unglazed Aqua Bella off white 2" tile. (Non-skid)
The gaps near the house...
Pool Build Finally Started - TX
Contract signed September 25th
Dig started November 3rd
Preliminary work was removing the sprinkler system in the back. Fencing to keep the dogs out of the build area.
Relocating some plants. All this was done by us -- Our landscaping contact ghosted after they installed a side gate.
Note on the design -- The first step is out of the water. It's completely covered with an unglazed Aqua Bella off white 2" tile. (Non-skid)
The gaps near the house...
Pool Build Finally Started - TX
No comments:
Post a Comment