After more than 6 months of designs, working with builders/contractors, I finally pulled the trigger on a build. It cost me almost double what I set out to pay, but the more time I invested, the less corners I wanted to cut. I wouldn't be here with this builder if it wasn't for an individual on this forum that reached out and shared their build story and provided a referral to their builder. This build includes the following basic design elements (much more represented in pictures):
- 784...
Austin, TX - Above Ground Salt Water Pool in Canyon - Construction Started 09/30/19
- 784...
Austin, TX - Above Ground Salt Water Pool in Canyon - Construction Started 09/30/19
No comments:
Post a Comment